Declining budgets exacerbate IT's inability to provide effective services to our students. In this challenging fiscal climate, George Mason University is managing a declining budget through the innovative use of virtual technologies. The replacement of select computer labs with virtual facilities allows Mason to maintain vital services while reducing costs.
Speakers
Resources

Comments

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

question: do you get an increase to call desk because VCL is "different"? answer: no, same or less. #E10_SESS067 #educause10

Majority of the time, students have less computing capacity on their own machine than blade server will provide. #E10_SESS067 #educause10

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

the GMU VCL is looking to move from AD/LDAP to Shibboleth for inter-campus usage. [possible BlackBoard tie-in?] #E10_SESS067 #educause10

Discussion about software licensing challenges: software per device or per user? [similar to RIAA debate] #E10_SESS067 #educause10

http://vss.umwblogs.org Software Licensing - includes Saas and PaaS as options. includes Vendor perspectives. #E10_SESS067 #educause10

GMU computer lab usage by day/hour/login #educause10 http://twitpic.com/2xjzw4 #E10_SESS067

George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

GMU still providing multimedia and stat labs as well as presentation practice rooms. VCL allows for more funding #E10_SESS067 #educause10

GMU "Collaborative Learning Hub" -> CLUB #E10_SESS067 #educause10

#E10_SESS067 up to $1M construction costs for a 100 seat computer lab. Metric: Range of $3500-$10000 per seat in construction? #educause10

Looking for insight... "Alternatives to traditional computer labs" #educause10 #E10_SESS067

#E10_SESS067 Resources added to Educause 2010 session: "Alternatives to Traditional Campus Computing Labs."

#E10_SESS067 Looking forward 2 discussing alternatives to traditional computer labs next week at this time (well, Pacific time) in Anaheim.


Comments

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

question: do you get an increase to call desk because VCL is "different"? answer: no, same or less. #E10_SESS067 #educause10

Majority of the time, students have less computing capacity on their own machine than blade server will provide. #E10_SESS067 #educause10

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

the GMU VCL is looking to move from AD/LDAP to Shibboleth for inter-campus usage. [possible BlackBoard tie-in?] #E10_SESS067 #educause10

Discussion about software licensing challenges: software per device or per user? [similar to RIAA debate] #E10_SESS067 #educause10

http://vss.umwblogs.org Software Licensing - includes Saas and PaaS as options. includes Vendor perspectives. #E10_SESS067 #educause10

GMU computer lab usage by day/hour/login #educause10 http://twitpic.com/2xjzw4 #E10_SESS067

George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

RT @themba: George Mason claims that they are saving 87% on power by moving to VCL over physical labs, #E10_SESS067 #educause10 low cost per square foot

GMU still providing multimedia and stat labs as well as presentation practice rooms. VCL allows for more funding #E10_SESS067 #educause10

GMU "Collaborative Learning Hub" -> CLUB #E10_SESS067 #educause10

#E10_SESS067 up to $1M construction costs for a 100 seat computer lab. Metric: Range of $3500-$10000 per seat in construction? #educause10

Looking for insight... "Alternatives to traditional computer labs" #educause10 #E10_SESS067

#E10_SESS067 Resources added to Educause 2010 session: "Alternatives to Traditional Campus Computing Labs."

#E10_SESS067 Looking forward 2 discussing alternatives to traditional computer labs next week at this time (well, Pacific time) in Anaheim.