Transitioning from Testing to Production

Abstract

To move the Shibboleth software to production requires attention to numerous technical issues such as performance, process, and service continuity. This session will present several campus' experiences with this transition and will offer concrete tips and suggestions for moving from installation to production.

Download Resources